Skip to main content

Main menu

  • Home
  • Themes
    • Water, Sanitation, Hygiene
    • Integrated Water Resource Management
    • Productivity and Efficiency
    • Governance
  • About
  • Training Resources
  • U.S. Domestic Resources
  • Guidance
    • How to Open a Database File
    • How to Open a Document

User menu

  • Log in
  • Sign up

U.S. Water Partnership Resource Portal

  • Water, Sanitation, Hygiene

Evaluation of Operation and Maintenance Interventions: Cairo Sewerage I Project

Link Broken? 
Access this resource
Share
Twitter logo Facebook logo LinkedIn logo
Document (.pdf, .doc)
1,583
Published: 
Tuesday, November 1, 1988
U.S. Agency for International Development
Evaluates project to improve Cairo's wastewater system through rehabilitation of the primary collection system, training of operation and maintenance staff, and development of expansion plans. Ex post external evaluation covers the period through 11/88. The project improved Cairo's wastewater system's operation and maintenance; since 1981, flooded areas have been reduced by nearly two-thirds. Pump stations and sewer cleaning still have deficiencies but are more effective due to a combination of new equipment, training, preventive maintenance, and management advice. The training component was effective but needs to be expanded (in regard to both technical and management training), since only 6%-7% of the work force has received training thus far. Effective operation of the General Organization for Sanitary Drainage (GOSD) is constrained by a lack of management autonomy and limited ability to raise revenues. The GOSD's budget is also inadequate and the provision of foreign currency for spare parts is uncertain. After the project was terminated, a 15-month hiatus in initiating follow-on Work Order IVA caused some of the gains made by the project to be lost. To reinstate the program to the level needed by 1991 (when clean water flowing into Cairo will exceed the new system's capacity) will require: (1) restoring preventive maintenance checklists and regular evaluations and training personnel from GOSD's Technical Evaluation Department to undertake these responsibilities; (2) initiating an annual competition, with prizes, for best station, crew, performance; (3) building an urgently needed pump repair shop; (4) improving the supply of and procedures for obtaining spare parts; (5) developing safety policy and providing safety equipment and training (an urgent need); (6) educating the public to avoid misuse of sewers; (7) amending building regulations in order to prevent building without sewers as well as the construction of buildings over manholes; (8) mapping the sewer system; and (9) establishing new maintenance depots.
Theme(s) & Sub-theme(s): 
SustainabilityWater, Sanitation, Hygiene
Resource type: 
Website/Blog
Region & Countries: 
Egypt, Arab Rep.Middle East and North Africa
Resource Scale: 
Global

Related resources

Policy Direction for Rural Water Supply in Developing Countries
Activity Report: Evaluation of Institutional Development Component of the Cairo Water II project
Fisheries Development Phase II
Need help using this resource?
U.S. Water Partnership

Footer menu

  • Search USWP Member Sites
  • Contact Us
  • Privacy Policy
  • Credits

© 2014 U.S. Water Partnership Web Portal